Building consent exemptions

What you can build or change without a building consent under Schedule 1 of the Building Act, each with its limits and clause.

  • Building Act 2004
  • F4/AS13rd Edition Amendment 21 Jan 2017

What needs no building consent

Find the work you are planning. Where it fits every limit on its card, it needs no building consent; where it does not, it needs one unless the council exempts it.

Before you start: no consent is not no rules

Exempt still has to comply

All building work must meet the Building Code, consent or not (s 17). Work with no consent must also leave the building no less compliant than it was, breach no other Act, and not be on a site that must be authorised as a hazardous substance location.

s 17, 42A

You decide, and you answer for it

The owner decides whether the work is exempt, and makes sure work with no consent meets the Building Code (s 14B). The council does not inspect it. Not sure? Ask a licensed building practitioner, an engineer or the council before you start.

s 14BMBIE: work you can do without a building consent

If it does not comply

The council can issue a notice to fix work that breaches the Act or does not meet the Code when it finds it (s 164). Ignoring the notice: a fine ≤ $200,000, and ≤ $20,000 a day while it goes on (s 168).

Work that needed a consent and went without one: a fine ≤ $200,000, and ≤ $10,000 a day while it goes on (s 40). It is put right with a certificate of acceptance, which the council grants only where it is satisfied the work meets the Code (s 96).

s 164, 168, 40, 96

Selling, insurance and the property file

The council's file holds consents and what comes with them, not exempt work (s 216), so a buyer's LIM will not show it unless you lodge it. Give the council the drawings, photos and any records of work, so the file matches what is on site. It may charge, and lodging is not a check. A granny flat under Schedule 1A is the exception: its records must go to the council (s 42B).

Work that does not comply can affect insurance and a sale. To have work signed off, apply for a building consent anyway: the council must process it.

s 216, 42BMBIE: work you can do without a building consent

Other rules still apply

The district plan: height, boundaries and site coverage may need a resource consent, whatever Schedule 1 says. Electrical, gas, plumbing and drainage work by people licensed for it, with their certificates. Health and safety on site. A barrier wherever a fall is ≥ 1 m (F4.3.1), and pool barriers, which no exemption covers.

Sch 1 cl 21; s 42A

Not restricted building work

Work exempt under Schedule 1 cannot be restricted building work (s 401B), so an LBP is needed only where a card says so. An LBP you hire still answers to the Building Practitioners Board for the work.

s 401B

Who can do the work

Part 1 work can be done by anyone, though some of it only where a licensed building practitioner (LBP) designs, builds or supervises it. Part 2 work must be done by a plumber or drainlayer authorised under the Plumbers, Gasfitters, and Drainlayers Act 2006. Part 3 work needs no consent only where a chartered professional engineer (CPEng) designs or reviews it and it is built to that design.

s 42A

Anything else the council agrees to

The council can exempt any work it considers likely to comply with the Building Code, or unlikely to endanger people or buildings if it does not. Ask before you build: the exemption is the council's to give.

Sch 1 cl 2

Repairs and like-for-like replacement

Repairing or maintaining any part of a building with a comparable product, or replacing it with a comparable one in the same place.

Not covered: replacing all or most of a specified system, or of anything structural or fire-rated; repairing or replacing something that failed on durability, such as cladding that leaked; sanitary plumbing and drainlaying, which are Part 2's.

Sch 1 cl 1

Electrical and gas work

Needs no building consent, unless it is part of a specified system covered by a compliance schedule, or could only be consented with a waiver of the Building Code. It still needs the licence and certificates the electrical and gas law ask for.

s 43

Sheds, sleepouts and small buildings

Shed, sleepout or garden studio

Detached and one storey: floor ≤ 1 m above the ground and ≤ 3.5 m from the floor to the top. No sanitary facilities and no drinking-water storage. Sleeping only where it goes with a house and has no kitchen, and over 10 m² with smoke alarms. Over 10 m², ≥ 1 m from any house and the boundary.

B1/AS1 here is the edition in force on 28 November 2019, which the Act names.

≤ 10 m²Anyone can build it10–30 m²≥ 1 m from the boundary1 mBoundary
Without a building consent
LimitsClause
Anyone≤ 10 m²cl 3
Anyone, walls and roof of lightweight products, built to B1/AS1 for timber or steel10–30 m²cl 3A
An LBP designs, builds or supervises it10–30 m²cl 3B
A kitset or prefab whose maker had a CPEng design or review it, built to that design10–30 m²cl 43

Sch 1 cl 3, 3A, 3B, 43

Granny flat or small house ≤ 70 m²

New, detached and single storey: ≤ 70 m² inside its walls, ≤ 4 m from the floor to the top, floor ≤ 1 m above the ground, ≥ 2 m from other houses and the boundary. Timber or steel frame, roofing ≤ 20 kg/m², cladding ≤ 220 kg/m², no mezzanine, no level-entry shower, electric or gas heaters only. Plumbing and drains to E1, G12 and G13's acceptable solutions, ≤ 30 fixture units, main drain ≥ DN100 at 1:60 and branches ≥ DN65 at 1:40, connected to the public network where there is one.

The council must issue a project information memorandum before work starts, and the work must be finished within 2 years of it. Within 20 working days of finishing you send the council the records of work, certificates and final plans. The council does not inspect it or issue a code compliance certificate. Licensed trades still do the restricted building, plumbing, drainage, electrical and gas work. The district plan is separate. A garage inside it is allowed.

≤ 70 m²Measured inside its walls

Sch 1A cl 1, 2, 3; s 42B

Plant room or building nobody enters

A detached building that houses fixed plant visited only to inspect or maintain it, that people cannot or do not normally enter, or that only builders use while working on another, consented building. It must stand at least its own height from any house and the boundary.

Sch 1 cl 4

Pole shed or hay barn in a rural zone

One storey: floor ≤ 1 m above the ground and ≤ 4 m from the floor to the top. ≤ 110 m², unsupported roof span ≤ 6 m, wind zone High or less (or design wind speed ≤ 44 m/s). Not open to the public and not storing hazardous substances. At least its own height from any house, road, railway and the boundary.

Without a building consent
LimitsClause
An LBP designs, builds or supervises itAll of the abovecl 4A
A CPEng designs or reviews itAll of the abovecl 49

Sch 1 cl 4A, 49

Tent, marquee or market stall

A tent, marquee, stall or booth: ≤ 100 m², up for ≤ 1 month.

Sch 1 cl 5

Repairing or replacing an outbuilding

All or part of a detached, one-storey outbuilding, on the same footprint and, if replaced, with a comparable one. Not one open to the public.

Sch 1 cl 7

Demolishing a building

Demolishing the whole of a detached building of ≤ 3 storeys. Removing any of the CPEng-designed structures on this page needs no consent either, however it was designed.

Sch 1 cl 30, 50

Outdoor structures

Pergola

Needs no consent at any size, attached to the house or free-standing, so long as it has no roof. With a roof it is a veranda or a carport, and their limits apply.

It still has to meet the Building Code. NZS 3604 does not cover a free-standing pergola, so its structure is specifically designed.

Any sizeNo consent, if it has no roof

Sch 1 cl 6NZS 3604: is the building inside it?

Carport

A roof for parking cars, on the ground and open on at least one side. Its size is its floor area, measured inside the posts; a larger one needs a consent.

A free-standing carport is outside NZS 3604, so its structure is specifically designed, or a kitset maker's engineered design.

≤ 20 m²Anyone can build it20–40 m²With an LBP or a CPEng
Without a building consent
LimitsClause
Anyone≤ 20 m²cl 18
An LBP designs, builds or supervises it20–40 m²cl 18A
A CPEng designs or reviews it20–40 m²cl 44

Sch 1 cl 18, 18A, 44NZS 3604: is the building inside it?

Porch or veranda

A porch is a roof over an entrance, open at the front; a veranda is a long one along a side. On or attached to an existing building, not over anywhere the public can go, such as a restaurant or bar. Its size is its floor area, counting what is already there: > 30 m² needs a consent.

On the first storey, F4 needs a barrier wherever people could fall ≥ 1 m. Roof water still goes to the stormwater, laid by an authorised drainlayer, and close to a boundary the rules on fire spreading next door apply.

≤ 20 m²Anyone can build it20–30 m²With an LBP or a CPEng
Without a building consent
LimitsClause
Anyone≤ 20 m², at ground or first storeycl 17
An LBP designs, builds or supervises it20–30 m², at ground levelcl 17A
A CPEng designs or reviews it20–30 m², at ground levelcl 46

Sch 1 cl 17, 17A, 46

Awning

On or attached to an existing building, not over anywhere the public can go, such as a restaurant or bar. A larger one needs a consent.

Without a building consent
LimitsClause
Anyone≤ 20 m², at ground or first storeycl 16
An LBP designs, builds or supervises it20–30 m², at ground levelcl 16A
A CPEng designs or reviews it20–30 m², at ground levelcl 45

Sch 1 cl 16, 16A, 45

Closing in a veranda or patio

Enclosing an existing veranda, patio or the like as a porch or conservatory of ≤ 5 m².

Sch 1 cl 15

Shade sail

Fabric or a similar light material, with its supports: ≤ 50 m², ≥ 1 m from the boundary, on the ground or on a building's ground or first storey.

Sch 1 cl 19

Deck, platform or boardwalk

Where nobody could fall more than 1.5 m from it, even if it collapsed.

No consent does not mean no barrier: from a fall of ≥ 1 m the deck needs one that meets F4 (F4.3.1), built with the deck. The barrier does not make it need a consent.

Fall ≤ 1.5 mNo consent neededFall ≥ 1 mNeeds a barrier to F4

Sch 1 cl 24F4: when a deck needs a barrier

Bridge on private land

A larger or higher bridge, or one over a road, railway or public area, needs a consent.

Without a building consent
LimitsClause
AnyoneNo fall > 1.5 m, even if it collapsescl 24
A CPEng designs or reviews itSpan < 6 m, no fall > 3 m even if it collapses, with a safety barrier, not over a road, railway or public area, not for public usecl 47

Sch 1 cl 24, 47

Retaining wall

Its limit is the depth of ground it holds up. A driveway, parking, a building, a pool, another wall or sloping ground above it is extra load, and needs a consent.

From a fall of ≥ 1 m off its top, F4 may need a barrier, by how the ground above is used, how easily people reach it and whether young children are about.

≤ 1.5 m of groundAnyone can build itNo load on the ground above
Without a building consent
LimitsClause
AnyoneRetains ≤ 1.5 m of ground and carries no load beyond it, such as carscl 20
A CPEng designs or reviews itIn a rural zone, retains ≤ 3 m, at least its height from the boundary and any buildingcl 41

Sch 1 cl 20, 41

Fence or hoarding

≤ 2.5 m, measured from its top to the ground directly below. A fence restricting access to a residential pool, or round a tank or pool, is not exempt.

A boundary fence is under the Fencing Act 1978 too, and the district plan may need a resource consent for a tall one.

≤ 2.5 m highAnyone can build itBoundary

Sch 1 cl 21, 23

Safety cover on a spa or small heated pool

Installing a safety cover as the way of restricting access to a small heated pool at a home.

Sch 1 cl 21A

Water tank or swimming pool

With the structure that holds it up, even as part of a consented building. The more it holds, the lower it must sit. Its fence or barrier is not exempt.

Without a building consent
Supported
≤ 500 L≤ 4 m above the ground
≤ 1,000 L≤ 3 m above the ground
≤ 2,000 L≤ 2 m above the ground
≤ 4,000 L≤ 1 m above the ground
≤ 8,000 L≤ 0.5 m above the ground
≤ 16,000 L≤ 0.25 m above the ground
≤ 35,000 LDirectly on the ground

Sch 1 cl 23

Water storage bladder

On the ground, ≤ 2 m high, ≤ 200,000 L, ≥ 100 m from any house and the boundary, used only for irrigation or firefighting.

Sch 1 cl 23A

Outdoor fireplace or pizza oven

On the ground, with no roof or wall over it: ≤ 2.5 m high, cooking surface ≤ 1 m², ≥ 1 m from the boundary and any building, its smoke no nuisance or hazard.

Sch 1 cl 28A

Playground equipment

Swings, slides, forts and the like.

Without a building consent
LimitsClause
A private householdNo part > 3 m above the groundcl 28
A government department, Crown entity, licensed early childhood centre, council or similar public body, a CPEng designing or reviewing itAny sizecl 42

Sch 1 cl 28, 42

Sign

Free-standing or on a structure, with its supports.

Without a building consent
LimitsClause
AnyoneEach face ≤ 6 m², top ≤ 3 m above the groundcl 25
A CPEng designs or reviews itAny sizecl 39

Sch 1 cl 25, 39

Solar panels

On a frame. On a roof, the frame is fixed to the roof structurally; on the ground, by more than one post. Wind zone High or less means a design wind speed ≤ 44 m/s.

Without a building consent
LimitsClause
On a roof, anyone≤ 40 m² in total, wind zone High or lesscl 28D
On a roof, a CPEng designs or reviews it> 40 m², or design wind speed > 44 m/scl 48A
On the ground, anyone≤ 20 m² (any size in a rural zone), top ≤ 4 m, ≥ 5 m from any house, road, railway and the boundary, wind zone High or lesscl 28C
On the ground outside a rural zone, a CPEng designs or reviews it20–40 m², with the same limitscl 48

Sch 1 cl 28C, 28D, 48, 48A

Plinth for plant, a tank or machinery

A plinth or similar foundation, any size, where a CPEng designs or reviews it.

Sch 1 cl 40

Stand for a water pipe

On the ground and ≤ 1 m high without the pipe, carrying one pipe ≤ 300 mm across that carries only water, on private land with no public access, ≥ 5 m from any house, road, railway and the boundary.

Sch 1 cl 28B

Height-restriction gantry

Any.

Sch 1 cl 26

Temporary stack of goods or materials

Any.

Sch 1 cl 27

Dam

Any dam that is not a large dam.

Sch 1 cl 22

Network utility structures

A simple structure such as a motorway sign, stopbank or road culvert, owned or run by a network utility operator or a similar organisation.

Sch 1 cl 29

Alterations to an existing building

Windows and exterior doors

Roof windows too, in an existing house or outbuilding of ≤ 2 storeys. Not where the one being replaced failed on durability, such as by leaking, or where the work affects a specified system.

Sch 1 cl 8

Widening a doorway for disability access

An existing entrance or internal doorway of a detached or semi-detached house, to improve access for people with disabilities.

Sch 1 cl 9

Internal walls and doorways

In any existing building, unless the wall is load-bearing, a bracing element, a fire separation, part of a specified system, or brick, block, concrete or stone laid in mortar.

Sch 1 cl 11NZS 3604: which walls are bracing

Linings and finishes in a house

The linings and finishes of any internal wall, ceiling or floor of an existing house.

Sch 1 cl 12

Insulation

Installing insulation in an existing building, except in an external wall or a fire separation wall.

Sch 1 cl 13

Ground moisture barrier

Laying one in an existing building's subfloor.

Sch 1 cl 13A

Holes for pipes, cables and ducts

≤ 300 mm across, with its weatherproofing, fire stopping and sealing. In a detached house, a house in a building of ≤ 3 storeys, or a detached outbuilding of ≤ 3 storeys, anywhere. In any other existing building, where it does not affect the primary structure or a specified system.

Sch 1 cl 14

Fit-out of a shop, office or other non-residential building

Interior work that does not affect the primary structure or a specified system, touches no fire separation wall or masonry wall, and includes no sanitary plumbing or drainlaying.

Sch 1 cl 10

Removing part of a building

From a building of ≤ 3 storeys, where it does not affect the primary structure, a specified system or a fire separation.

Sch 1 cl 31

Plumbing and drainage, by an authorised plumber or drainlayer

Repairing or replacing plumbing and drains

Repairing with comparable products, or replacing like for like in the same place. Not replacing all or most of a specified system, anything that failed on durability, or a water heater except as below.

Sch 1 cl 32

Opening a drain's access point

Opening and reinstating a purpose-made access point in a drain that is not the network operator's.

Sch 1 cl 33

Small changes to a house's drains

A minor alteration, such as moving a gully trap. Not a new connection to a network utility's service.

Sch 1 cl 34

Altering sanitary plumbing

Where the building ends up with no more sanitary fixtures than before, no specified system is affected, and the water heater is not altered.

Sch 1 cl 35

Water heaters

Any other change to a water heater needs a consent.

Without a building consent
LimitsClause
Repair or maintainWith comparable productscl 36
Replace an open-vented storage heater on a wetback or other supplementary heat exchangerWith a comparable open-vented heater, in the same place, on the same pipescl 37
Replace or move oneEvery heat source it has is controlledcl 38

Sch 1 cl 36, 37, 38

Terminology

Licensed building practitioner (LBP)
A designer, builder or other trade licensed under the Building Act to carry out or supervise restricted building work.
Chartered professional engineer (CPEng)
An engineer registered under the Chartered Professional Engineers of New Zealand Act 2002.
Specified system
A system that keeps a building safe and healthy and is checked under a compliance schedule: sprinklers, fire alarms, lifts, mechanical ventilation, backflow preventers and the like.
Sanitary facilities
Toilets, urinals, basins, baths, showers and the like.
Project information memorandum (PIM)
The council's report on a site and what it knows about it, such as natural hazards and services.
Rural zone
A zone the district plan calls rural, a rural resource area or rural environment. Not a rural residential area.

This page reads Schedule 1, Schedule 1A and sections 42A, 42B and 43 of the Building Act 2004 and sets out what they say. It is not legal advice and does not replace reading the Act. The council decides whether work is exempt, and can exempt work this page does not list: where you are unsure, ask before you build.

Building Act 2004 on legislation.govt.nz