Reads H1/AS1 · NZS 4214 · E3/AS1
Construction R-value
Work out the R-value of a roof, wall or floor from its layers, then check the whole house against the reference building.
Calculates
For architects, architectural designers and technicians, building consent officers and students. Put your design in and get the Building Code's answer back: drains sized, bracing checked, R-values worked out, every document's limit for a door or stair on one page. Each number names its clause and edition, ready for the consent drawings and the council's questions.
Reads H1/AS1 · NZS 4214 · E3/AS1
Work out the R-value of a roof, wall or floor from its layers, then check the whole house against the reference building.
Calculates
Reads every document at once
Every document's limit for the door, stair or room you are drawing, side by side, with the one that binds marked.
Compares every document
Reads G13/AS1 · AS/NZS 3500.2
Put the fixtures on your own floor plans and get the sanitary plumbing and drains sized, vented and drawn. Your plans stay in this browser.
Designs from your plans
Reads B2/AS1 · NZS 3604 · NZS 3602 · E2/AS1
Find the treatment each timber part of a house needs, the steel that fixes it in the site's exposure zone, and which materials may touch.
Schedules by part and zone
Reads NZS 3604 · Building Product Specifications
Draw the house or trace your own floor plan, put any maker's bracing on its lines, and see the demand met line by line, with the roof's braces counted.
Calculates from your plans
Reads NZS 3604
Lay a timber floor out on its plan and get the joist, bearer and footing sizes, with the anchor and braced piles that brace it.
Lays out from your plans
The standards the Building Code's documents cite, each figure with its clause.
AS/NZS2025
Sanitary Plumbing and DrainageIts four venting systems and the sizes each is designed to, and why a design to the 2025 edition is an alternative solution.
Tools: Drainage design · Plumb the house
NZS2011
Timber-framed BuildingsWhat NZS 3604 asks of a house's bracing, subfloor, lintels, studs and roof framing, each point with its clause, beside calculators for its bracing and subfloor framing.
Tools: NZS 3604 Bracing · Subfloor framing · Openings and lintels
NZS2001
Design for Access and MobilityBuildings and associated facilities
Accessible car parks, routes, toilets and the space each facility needs, by the standard's own sections. Sections 11 and 12 are not in here yet.
Tool: Dimensions
What the Act decides before any clause of the Code: whether the work needs a consent at all.
Building Act 2004Version as at 30 June 2026Schedules 1 and 1A
Every exemption in the Act, each with its limits and clause: what anyone can build, what needs a licensed building practitioner or an engineer's design, and what still has to meet the Code.
Sheds and sleepouts · Granny flats · Decks · Fences · Carports · Pergolas · Retaining walls · Solar panels · Internal walls
44 kinds of work
What each clause asks, what the drawings show, and where the documents part.
Durability provisions for building elements
How long each building element has to last, by element and situation, and where E2/AS1 gives a hidden element a different period.
Protection from fire for buildings with sleeping (residential) and outbuildings (risk group SH)
Whether a residential design is within the scope of C/AS1, and the requirements of Parts 2 to 7 that follow.
Design a stair from its floor-to-floor height or a ramp from its rise, then check doors, handrails, headroom and slip.
Size gutters, downpipes and drains for the site's rainfall intensity, with sump types and drain access.
External moisture provisions for timber-framed buildings up to 10 m in height
Score each elevation's weathertightness risk, then the claddings and flashings that score allows. 9.4 to 9.9 and Part 10 are not in here yet.
What wet areas put on the drawings: the finishes E3 accepts, containment, a floor waste and the shower.
Check a barrier against Table 1 and an opening window against 2.1, then every requirement of F4/AS1.
Compliance Document for New Zealand Building Code Clause G1
How many WC pans, urinals, basins, baths and showers a building needs by Tables 1 to 4, and which must be accessible.
Check one laundry against Figure 1: the tub, the washing machine and the clear floor in front of them.
Check one kitchen against Figure 1: the bench run, the clear space, the sink and the food store.
Ventilation of buildings
Net openable area, extract flowrates and trickle ventilators room by room, then gas appliance vents. A wall terminal's clearances are AS/NZS 5601.1's and are not worked out.
Natural Light for simple buildings up to three storeys excluding those with borrowed daylight
Each habitable room against both: G7/AS1's glazing, glass and window head, and G7/AS2's deepest room for its glazing, overhang and the buildings opposite.
Where LPG cylinders can stand: the clearances to openings, drains and ignition sources, and the path from the truck.
Check one water heater: its temperatures, relief valve drain, safe tray and seismic straps.
Which document covers the plumbing and which the drains, the ways to comply, and which of five venting systems suits the building.
Energy efficiency for all housing, and buildings up to 300 m²
What H1/AS1 asks of a building's thermal envelope, what the consent drawings show for it, and how it changes NZS 4214's method.