Subfloor framing
A timber floor's joists, bearers and piles laid out on its plan, their sizes and each pile's footing, and the piles that brace it, to NZS 3604.
- NZS 3604:2011
How each step is worked out: subfloor framing, what NZS 3604 covers.
Joists, bearers and piles
NZS 3604:2011 5.5, 6, 7.1Draw the floor's outline, or use the building's from the bracing plan, and choose the floor load and spacings; the floor is laid out on it. Click a pile to make it brace, drag a row of bearers to move it.
The floor
Floor load
Flooring
Joists at, mm
Floor above the ground
Bearers and piles
Bearers run
Bearer spacing
Piles along a bearer at, m
Piles inside carry
For the subfloor's bracing
Subfloor cladding
Walls and roof
Works best with a plan drawn to scale and printed on A3 or A4, with its grid lines, no furniture, and the walls, doors and windows drawn clearly.
Click a floor to choose it, a pile tool above to change its piles. Drag a row of bearers to move it.
- Ordinary pile
- Carries the floor down to its footing. It does no bracing. Drawn to scale, 125 mm square.
- Anchor pile
- Drawn solid. Set deep and bolted to the bearer and joists, it braces the floor both ways on its own.
- Braced pair
- Two piles with a diagonal timber brace between them, both on braced footings. It braces the floor the way the brace runs.
- Foundation wall
- Reinforced concrete or reinforced masonry, along a side of the floor. It braces the floor along its length, rated by its length against its height.
- Footing
- The concrete footing under each pile, dashed, at the round size this pile needs.